Project detail
Hangzhou Urban Flood Dike Protection Dike (phase II-bid 03)
introduction

The design standard for this project is for 500-year return period tidewater with level-12 typhoon, and 100-year return period flood. The concrete retaining wall is gravity type structure. It was awarded with Zhejiang Province Construction Project Qianjiang Cup Medal (excellent project).