Project detail
Hangzhou Zhonghe Overpass
introduction

The project is 839.862m long from south to north, 778.346m long from east to west, the north section is construted by our company. The bridge is of prestress box-type double suspension structure, the main span is 46m long, lower structure is high pile bridge platform, diameter of pile is 1.2m.