Project detail
Approch Bridge at South Bank of Third Qiangtangjiang Bridge
introduction

This project consists of access bridge and up and down ramps. The access bridge is totally 417m long and the ramp is 305m long. It is built with prestressed hollow slab beam and continuous box-beam structure, the foundation is made of concrete cast-in-place pile and the diameter of 1.5m with a length of 45m.